Interface365 for Construction

A setup guide for residential builders, commercial GCs, remodelers, and specialty trades. Long sales cycles, bid-driven work, change orders, and the unique double-cycle of winning the bid then delivering the project.

See the live walkthrough Watch a single $720K kitchen + addition project flow end-to-end through Interface365 — from architect referral through site visit, $850K estimate, $130K value-engineering trade, contract, framing, mid-build change order, and substantial completion. 15 steps →
Two distinct paths covered: Residential remodelers / custom builders, and commercial general contractors / specialty subs. Both share the same building blocks — the pipelines and field sets are different.

1. Component utility matrix

Decide fast: do you need everything Interface365 ships with for your kind of construction firm? The honest breakdown — what's critical, what's nice-to-have, and what you can safely skip.

ComponentUseful?Why
Pipelines (sales + projects)✓ CriticalBid pipeline + active project tracking are different motions. Two pipelines, both essential. See walkthrough · Step 7 + Step 13.
Projects module✓ CriticalActive projects need their own entity — change orders, draws, subs, timelines all map cleanly. The bid pipeline ends at "Won"; the project pipeline starts where the build does.
Custom fields✓ CriticalProject type, sqft, permits, materials grade, contract value, draw schedule — non-negotiable construction data.
Quotes / line items✓ CriticalEstimates and change orders are line-item-driven. Native quotes save hours per estimate. See walkthrough · Step 9.
Tasks✓ CriticalPermit follow-ups, sub coordination, inspection scheduling, draw triggers — small tasks drive the work.
Tags✓ ImportantRepeat client, architect referral, public works — drive different sales motions and reciprocity tracking.
Activity types✓ ImportantSite visit, pre-bid, change order, closeout — distinct events with distinct templates.
Forecasting✓ ImportantCashflow planning is everything in construction. Weighted forecast drives sub commitments + materials lead-time decisions.
Saved views✓ Important"Stagnant estimates > 7 days", "Active builds with permit issues", "Change orders pending signature" — operational essentials. Stagnant-estimate recovery alone pays for the CRM. See walkthrough · Step 10.
Webhooks / API~ UsefulOutbound webhooks pair Interface365 events with QuickBooks (invoicing), BuildingConnected / Procore (plan rooms), Slack (site updates).
Multi-currency✗ SkipDomestic construction work — single currency unless you're cross-border.
Teams & permissions✓ ImportantEstimators see bids, PMs see active projects, owners see all — visibility tiers matter.

Sections 2–8 below explain the configuration. Section 9 covers commission management for estimators + PMs. Section 10 explains how Interface365 fits alongside QuickBooks, Procore, BuildingConnected, and your existing tools.

2. Overview

Construction sales has features no other industry shares quite the same way:

  • Bid-driven sales motion. You aren't selling a fixed product — you're submitting a bid against detailed specs. Many bids never materialize.
  • Months-long cycles. A commercial bid might sit dormant for 3 months between submission and award. Pipeline aging matters more than for any other industry.
  • The deal continues post-signature. Change orders, draw schedules, subcontractor coordination, punch lists — winning the contract is the start of the work.
  • Margin lives in the details. 5% on a $500K project is meaningful. Tracking estimated vs actual cost requires structured data.

3. Recommended pipeline (residential)

For custom builders and remodelers selling to homeowners:

StageProbabilityWhat it means
New Inquiry5%Homeowner inquired (web, referral, Houzz). Not yet contacted.
Site Visit Scheduled15%Walkthrough booked.
Site Visit Complete25%You've seen the project. Estimate in progress.
Estimate Drafted40%Internal estimate complete, awaiting review.
Estimate Sent55%Bid delivered to homeowner.
Negotiation70%Scope/price discussions in progress.
Contract Signed90%Agreement signed, deposit incoming.
Won — Project Active (Won)100%Work has started. Move to project pipeline.
Lost (Lost)0%Lost — log reason (price, timing, competitor).

4. Recommended pipeline (commercial)

For commercial GCs and specialty subs working bid-driven projects:

StageProbabilityWhat it means
Project Identified5%Spotted via plan rooms, owner outreach, or partner intel.
Plans Reviewed10%Drawings + specs reviewed internally.
Pre-bid Meeting20%Walkthrough or pre-bid attended.
Bid In Progress30%Estimating actively working.
Bid Submitted40%Numbers delivered. Awaiting decision.
Shortlisted55%Made the cut. Final negotiations or interviews scheduled.
Awarded85%Letter of intent received. Contract drafting.
Contract Signed (Won)100%Bonded, mobilized, ready to break ground.
Lost (Lost)0%Did not win — log who won and price gap.

5. Custom fields cheatsheet

On the deal record (residential)

Field nameTypeWhy it matters
project_typeDropdown (Kitchen, Bath, Addition, New Build, Whole-home, Outdoor)Filters reports, drives templates and pricing.
estimated_sqftNumberPer-sqft analytics for bidding accuracy.
estimated_valueCurrencyInitial budget given to client.
final_contract_valueCurrencySigned contract amount.
materials_gradeDropdown (Standard, Premium, Luxury)Drives margin and supplier selection.
start_dateDateConstruction start.
completion_dateDateSubstantial completion target.
project_addressTextJob site address.
permit_statusDropdown (Not started, Submitted, Issued, Closed)Critical scheduling dependency.

On the deal record (commercial)

Field nameTypeWhy it matters
project_valueCurrencyTotal contract value.
bid_due_dateDateHard deadline.
general_contractorTextIf you're a sub — who's the GC?
bond_requiredCheckboxPerformance/payment bond required (yes/no).
prevailing_wageCheckboxDavis-Bacon / public-works wage requirements.
project_classificationDropdown (New construction, Renovation, TI, Tenant Build-out)Drives estimating templates.
bid_strategyDropdown (Aggressive, Standard, Premium)Internal pricing posture for the bid.
plan_room_linkURLLink to BuildingConnected, Procore, or similar.

6. Activity types

Construction-specific activity types under Settings → Activity Types:

  • Site visit — initial walkthrough
  • Pre-bid walkthrough — commercial pre-bid meeting
  • Estimate review — internal estimating session
  • Owner meeting — homeowner / project owner
  • Subcontractor call — coordination with subs
  • Change order discussion — scope/price changes mid-project
  • Punch list walkthrough — final completion review
  • Closeout — handover and warranty

7. Lead statuses + tags

Lead statuses for pre-pipeline qualification:

  • New — fresh inbound, not yet contacted
  • Qualifying — site visit scheduled or pricing being discussed
  • Bid Awarded — won, deal created in pipeline
  • Postponed — homeowner/owner not ready (revisit in 90+ days)
  • Disqualified — wrong size, wrong location, can't deliver

Recommended tags:

  • Repeat client (green) — has worked with you before
  • Architect referral (blue) — came through architect partner
  • Plan room (purple) — sourced from BuildingConnected/Procore
  • High margin (gold) — luxury or specialized work
  • Public works (red) — government / prevailing wage

8. End-to-end workflow

A Wednesday at a residential remodeler with $5M annual revenue, two estimators, and four active projects.

1

7:30am — Pipeline review

Owner opens Interface365 dashboard. Pipeline value: $1.4M weighted. Three estimates aged 14+ days flag for follow-up. Two projects flagged with permit issues.

2

9:00am — Site visit

Estimator visits a kitchen remodel prospect. Logs Site visit activity, takes photos, notes scope. Sets project_type = Kitchen, estimated_sqft = 280, materials_grade = Premium, estimated_value = $85,000. Moves deal to Site Visit Complete.

3

11:00am — Estimate sent

Yesterday's bath remodel estimate is approved internally. Estimator emails homeowner the formal estimate with line items. Moves deal to Estimate Sent. Forecast updates: $48K weighted.

4

1:30pm — Stalled estimate follow-up

Three estimates stuck 14+ days. Owner runs the saved view, calls each homeowner personally. One signs the contract on the call — drag deal to Contract Signed. Two say "next month" — move to nurture.

5

3:00pm — Change order on active project

Active addition project: client wants to add a bay window. Project manager logs Change order discussion activity, opens the project record, drafts a $12K change order quote. Updates final_contract_value from $145K to $157K.

6

4:30pm — Permit status update

City issues two permits today. PM updates permit_status = Issued on both project records. Webhook fires — Slack #operations channel notified, materials ordering team starts procurement.

9. Estimator + PM commission management

Most residential design-build firms pay estimators a small percentage on signed contracts (1–3%) plus pay project managers a margin-based bonus on substantial completion (typically 10% of net margin, or a flat per-project bonus). Commercial GCs more often run flat-salary estimating with a project-margin bonus pool. Either way, Interface365 doesn't ship a comp engine — model the data here so payout is unambiguous each cycle.

The four-field setup on Deal

Add these custom fields under Settings → Custom Fields → Deal:

FieldTypeUse
estimator_assignedUser referenceWhose estimate won. Drives commission attribution.
estimator_commission_rateNumber (percent)Estimator's rate on this contract — typically 1–3%, paid on first draw.
pm_bonus_rateNumber (percent)PM's bonus rate on net margin — typically 10%, paid on substantial completion.
commission_payout_statusSelectOptions: pending, estimator_paid, pm_paid, complete. Most firms pay estimator on first draw, PM on substantial completion.

Worked example — Whitfield project from the walkthrough

  • Contract value = $720,000 (after VE)
  • Change order #1 = +$28,200 (windows + powder room)
  • Final contract value = $748,200
  • estimator_assigned = Rachel Ochoa
  • estimator_commission_rate= 1.5%
  • pm_bonus_rate = 10% (of net margin)
  • Estimator commission = $720,000 × 1.5% = $10,800 (paid on first draw)
  • Net margin (forecast) = $748,200 × 18.7% = $139,913
  • PM bonus = $139,913 × 10% = $13,991 (paid on substantial completion)
  • Total comp = $24,791 (split across two trigger events)
  • CO commission rule = estimators get a half-rate (0.75%) on change orders they price → +$211 to Rachel on the CO

Three saved views every firm needs

  • "My estimates won this quarter" — saved view filtered to estimator_assigned = me, status = won, closed_at >= quarter_start. Each estimator gets their own.
  • "PM bonuses pending payout" — owner-only saved view filtered to commission_payout_status = pm_paid IS NULL, project_status = substantially_complete. Reconciled at end of pay period.
  • "Hit-rate by estimator" — pivots estimates-sent vs contracts-signed per estimator over trailing 90 days. Surfaces who's writing winnable estimates + who's overpricing or chasing the wrong leads.

For firms that pay tiered margin bonuses (PM bonus rate climbs from 10% → 12% if project net margin clears 20%, for example), add a margin_tier custom field on the project record and resolve at substantial completion. Most residential firms keep it simple with a flat rate; commercial GCs more often go tiered.

10. Where Interface365 fits — alongside, not against, your construction stack

Construction firms run a stack: estimating tool for takeoffs, accounting for AP/AR + payroll, project management for the field, scheduling for crews, plan rooms for commercial bids, CRM for the funnel + change orders + client comms. The real question isn't "Interface365 OR Procore?" — those tools don't compete; they own different layers. The right question is: "where does Interface365 sit in my stack?"

Interface365 is positioned as the sales / pre-construction / client-facing layer — bid pipeline, estimate creation, value-engineering conversation, contract signing, change-order workflow, draw schedule, owner referral economics. It is NOT a takeoff tool, accounting system, or field-PM software. The handoffs are clean — webhooks fire on Won, on draw triggers, on change-order signature.

The "alongside" pattern (most residential design-build + small-to-mid commercial GCs)

LayerToolWhat it owns
Sales + CRM + change ordersInterface365Inquiry → site visit → estimate → VE → contract → change orders → closeout. Source of truth for the funnel + the client relationship.
Estimating / takeoffBuildertrend / CoConstruct / PlanSwift / BluebeamQuantity takeoffs from drawings, assembly costing, sub bid solicitation. Output rolls into Interface365 line items.
Accounting + AP/ARQuickBooks / Sage 100 Contractor / FoundationJob costing, payroll, sub payments, lien waivers, invoicing. Webhook deal.won + draw.triggered → invoice creation.
Field PM + daily logsBuildertrend / CoConstruct / Procore / FieldwireDaily reports, RFIs, submittals, punch lists, photos, weather logs. Interface365 surfaces high-level project status; field PM tracks the day-to-day.
SchedulingMicrosoft Project / Smartsheet / BuildertrendGantt schedules, crew assignment, sub coordination. Interface365 holds milestone dates + draw triggers; the scheduler holds the granular timeline.
Plan rooms (commercial only)BuildingConnected / iSqFt / SmartBid / PlanGridCommercial bid intake, addendum tracking, GC ↔ sub matching. Interface365 attaches each plan-room project as a Deal with the room URL on the record.

This is exactly what walkthrough Step 12 demonstrates — contract signed fires webhooks to Slack + QuickBooks + procurement. The tools don't fight; they each do what they're best at.

When Interface365 alone is enough

  • Solo to small residential remodelers (1–8 staff) — Interface365 + QuickBooks + a calendar tool is the entire stack. Field-PM software can wait until you're running 6+ active projects.
  • Specialty trade subcontractors — bid pipeline + change-order tracking + customer/GC relationships are the whole job. Interface365 sized perfectly for $1–10M annual revenue subs.
  • Custom builders doing 4–10 homes/year — a structured CRM with the project module covers sales + client comms + change orders cleanly. Pair with QuickBooks for accounting.

When to pick something else outright

  • Volume residential builders (50+ homes/year) — production-builder software (Buildertrend Enterprise, MarkSystems, Hyphen Solutions) bundles takeoff + scheduling + accounting + warranty in a single ERP. Interface365 doesn't compete here — adopt a dedicated production-builder ERP.
  • Large commercial GCs ($50M+ annual revenue) — Procore + Sage 300 CRE + a dedicated estimating tool (DESTINI / WinEst) is the standard stack. Interface365 is sized for $1–30M annual revenue construction firms.
  • Heavy civil / infrastructure GCs — your CRM-side life is dominated by public-works bid intake, prevailing-wage compliance, bonded contracts, and DOT relationships. Use a public-works-specialised CRM (Building Radar, ConstructConnect) or just rely on the plan rooms directly.

Bottom line: think of Interface365 as the sales + change-order + client-relationship layer, sitting cleanly above your accounting and below your takeoff/field-PM tools. The boundary is "anything client-facing or pipeline-related" lives here; "anything field-side or accounting-side" stays in the specialist tools.